All the necessary hardware is included with your kit and the extensions. The basic 48” kit includes 2 brackets and every 32” extension section includes 1. Bays and corner flexible pieces include 2 brackets per flex piece so the bend angle can be securely maintained.
To correctly place the brackets, measure from the top tuck groove on the back to the bottom of the topper. Determine how far the topper should drop over the top edge of the window.
eg.12” high cornice, measures 10” from top groove to the bottom of the cornice Desired drop is 6” over the top of the window Height of bracket above the top of the window is 4”
Measure from the top of the window up 4”. Place the bend of the bracket at the 4” height and mark the wall through the slot where you will place the two anchors and screws.
Drill holes, tap in both anchors, screw in the top screw, leaving 1/16" between the head of the screw and the wall/anchor. Set the hardware onto the screw, lower the bracket in place, and then tighten the screw. Insert and tighten the lower screw.
Hang your completed topper by placing it up to the brackets that you have mounted on the wall, align the back tuck groove to the bracket and push it on for a secure fit.
Noise Dampening: Green Glue is a provider of top-selling soundproofing solutions. We offer the best selling noiseproofing products of its kind worldwide, with millions of square feet used to soundproof walls, floors, and ceilings.